The Project encompasses measures related to the water supply and sewage network construction and reconstruction of in Tivat.
Systematic improvement of the water supply and wastewater disposal system, as well as the improvement of environmental conditions.
Addressing urgent investment measures in the water supply and sewage system and improving environmental conditions in Tivat.
Construction of the third phase of Djurasevici–Radovici water transmission pipeline, construction of a secondary sewage network in the Lustica area, and connection of the higher urban zones (Mazina and Tripovici) to the sewer main and the wastewater treatment plant, resulting in improved quality of water supply and wastewater disposal services, reduced pollution of the sea, coast, and land, and enhanced environmental protection.
Improvement of the wastewater management system in the area of Tivat through the construction of a modern facility that enables efficient wastewater collection, treatment and discharge into a recipient in accordance with European environmental standards.
Reduction of pollution in the Bay of Kotor and the coastal area, improved municipal infrastructure in Tivat, protection of public health, and enhanced quality of life.
Sustainable improvement of water supply and wastewater disposal, ensuring water availability throughout the year and particularly during the summer season.
Contribution to the economic development of Montenegro through the promotion of tourism and the improvement of natural resource protection, reflected in increased tourism revenue, water quality, and the reduction of water losses to below 50%.
Construction of a 22.5 km water supply and sewerage system (primary 8,035 m, secondary 8,910 m, and tertiary sewer network 4,250 m, including 1,230 m of pressure pipelines and reconstruction of the main water pipeline, and 4 pumping stations with mechanical and electrical equipment).
Improvement of the water supply and sewerage system, and an increase in the number of connections to the sewer network.
Construction of a 22.5 km water supply and sewerage system (primary 8,035 m, secondary 8,910 m, and tertiary sewer network 4,250 m, including 1,230 m of pressure pipelines and reconstruction of the main water pipeline, and 4 pumping stations with mechanical and electrical equipment).
Improvement of the water supply and sewerage system, and an increase in the number of connections to the sewer network.