Water Supply and Sanitation Adriatic Coast – Tivat
PHASE V-2
Project status: Ongoing
Value: €27,708,025.23 (works execution) + €977,514.80 (engineering supervision)
Funding sources: Phase V-2 KfW loan, WBIF grant, Municipality’s own contribution
Role of Vodacom: Project Management and Consultant's partner
Consultant: Contract execution is still in progress
Contractor: Contract execution is still in progress
Commencement date: Q4 2025
Description:

The Project encompasses measures related to the water supply and sewage network construction and reconstruction of in Tivat.

Expected project result:

Systematic improvement of the water supply and wastewater disposal system, as well as the improvement of environmental conditions.

Implemented projects

Implementation of Immediate Investment Measures for Tivat, Kotor and Herceg Novi
PHASE V1
Project status: Completed
Value: Euro 4.9 million
Funding sources: KfW loan
Role of Vodacom: Project Management
Consultant: Dahlem – responsible for drawing up the tender documentation
Contractor: MPP Jedinstvo
Implementation period: July 2015 – July 2019
Description:

Addressing urgent investment measures in the water supply and sewage system and improving environmental conditions in Tivat.

Project results:

Construction of the third phase of Djurasevici–Radovici water transmission pipeline, construction of a secondary sewage network in the Lustica area, and connection of the higher urban zones (Mazina and Tripovici) to the sewer main and the wastewater treatment plant, resulting in improved quality of water supply and wastewater disposal services, reduced pollution of the sea, coast, and land, and enhanced environmental protection.

Construction of a Joint Wastewater Treatment Plant (WWTP) for Tivat and Kotor for 72,000 PE
PHASE IV
Project status: Completed
Employers: Municipalities and ViKs of Tivat and Kotor
Value: €10.247 million
Funding sources: Municipality of Tivat – €6.110 million, of which €0.003 million from Phase IV, €5.936 million from Phase V, and Municipalities’ own contribution of €0.170 million
Contractor: WTE, FR Germany
Implementation period: January 2015 – August 2016
Description:

Improvement of the wastewater management system in the area of Tivat through the construction of a modern facility that enables efficient wastewater collection, treatment and discharge into a recipient in accordance with European environmental standards.

Project results:

Reduction of pollution in the Bay of Kotor and the coastal area, improved municipal infrastructure in Tivat, protection of public health, and enhanced quality of life.

Projekat izgradnje 17,6 km kanalizacione mreže, 14,5 km vodovodne mreže, 6 većih i 6 manjih pumpnih stanica u južnom dijelu Opštine Tivat
PHASE IIIb
Project status: Completed
Employers: Municipality and ViK Tivat
Value: €9.49 million
Funding sources: KfW loan of €5.379 million, KfW grant of €0.155 million and own contribution of Tivat Municipality in the amount of €3.955 million
Contractor: Ludwig Pfeiffer, FR Germany
Implementation period: November 2011 – April 2016
Description:

Sustainable improvement of water supply and wastewater disposal, ensuring water availability throughout the year and particularly during the summer season.

Project results:

Contribution to the economic development of Montenegro through the promotion of tourism and the improvement of natural resource protection, reflected in increased tourism revenue, water quality, and the reduction of water losses to below 50%.

Construction of 19.9 km of sewage and water supply network and 2 pumping stations in downtown Tivat
PHASE IIIa
Project status: Completed
Employers: Municipality and ViK Tivat
Value: €6.00 million
Funding sources: KfW loan of €1.297 million, KfW grant of €2.556 million and own contribution of Tivat Municipality in the amount of €3.42 million
Contractor: Ludwig Pfeiffer, FR Germany
Implementation period: January 2009 - March 2011
Description:

Construction of a 22.5 km water supply and sewerage system (primary 8,035 m, secondary 8,910 m, and tertiary sewer network 4,250 m, including 1,230 m of pressure pipelines and reconstruction of the main water pipeline, and 4 pumping stations with mechanical and electrical equipment).

Project results:

Improvement of the water supply and sewerage system, and an increase in the number of connections to the sewer network.

Construction of the sewer main with a siphon and pumping station, and construction of the secondary sewer network
PHASE II
Project status: Completed
Value: €7.3 million
Contractor: MONTMONTAZA – HIDROINZENJERING DOO, SPLIT
Implementation period: January 2007 - March 2009
Description:

Construction of a 22.5 km water supply and sewerage system (primary 8,035 m, secondary 8,910 m, and tertiary sewer network 4,250 m, including 1,230 m of pressure pipelines and reconstruction of the main water pipeline, and 4 pumping stations with mechanical and electrical equipment).

Project results: