Kotor

Ongoing Projects

Water Supply and Sanitation Infrastructure Adriatic Coast-Bay of Kotor
PHASE V-2
Project status: Ongoing
Value: €33,287,791.14 (works execution) + €1,151,688.44 (engineering supervision)
Funding sources: Phase V-2 KfW loan, WBIF grant, Municipality’s own contribution
Role of Vodacom: Project Management and Consultant's partner
Consultant: Contract execution is still in progress
Contractor: Contract execution is still in progress
Commencement date: Q4 2025
Description:

Project measures within this Project relate to the construction and reconstruction of the water supply and sewerage network in Risan, Perast, Stoliv, Prcanj, and Muo.

Expected project result:

Systematic improvement of the water supply and wastewater disposal system, as well as the improvement of environmental conditions.

Implemented projects

Implementation of Immediate Investment Measures for Tivat, Kotor and Herceg Novi
PHASE V1
Project status: Completed
Value: Euro 4.9 million
Funding sources: KfW loan
Contractor: MPP Jedinstvo AD
Implementation period: July 2015 – July 2019
Description:

Addressing urgent investment measures in the water supply and sewage system and improving environmental conditions in Kotor.

Project results:

Increased reliability and efficiency of the water supply system, including new measuring and control chambers and improved metering at the Stara Forteca reservoir. Replacement and modernization of the Peluzica pumping station to contribute to continuous water supply in critical parts of the network. Better water control and distribution in the settlements, including Sv. Stasije, Daosine, Grbalj, and Dobrota.

Construction of a Joint Wastewater Treatment Plant (WWTP) for Tivat and Kotor for 72,000 PE
PHASE IV
Project status: Completed
Value: €10.247 million
Funding sources: Municipality of Kotor – loan of €3.33 million, and Municipalities’ own contribution of €0.801 million
Contractor: WTE, FR Germany
Implementation period: January 2015 – August 2016
Description:

Improvement of the wastewater management system in the area of Kotor through the construction of a modern facility that enables efficient wastewater collection, treatment and discharge into a recipient in accordance with European environmental standards.

Project results:

Reduction of pollution in the Bay of Kotor and the coastal area, improved municipal infrastructure in Tivat, protection of public health, and enhanced quality of life.

Construction of 34.2 km of water supply and sewerage network and 5 pumping stations
PHASE III
Project status: Completed
Employers: Municipality and ViK Kotor
Value: €6.771 million
Contractor: MPP Jedinstvo AD, Uzice
Implementation period: May 2011- July 2013
Description:

Improvement of water supply system and construction and reconstruction of collector networks and modernization of existing systems. Contribution to environmental protection, improvement of the quality of services and sustainable development of tourism on the Montenegrin coast.

Project results:

Construction and reconstruction of the water supply and sewage infrastructure that resulted in improved capacity and reliability of the water supply system, reduced pollution of the marine and land environment, improved protection of water resources, and better conditions for the life of the population and the development of tourism along the Montenegrin coast.

Water Suppply and Sanitation in Kotor
PHASE II
Project status: Completed
Value: €1.3 million
Contractor: INTEGRAL INZENJERING DOO LAKTASI BIH
Implementation period: 2007-2009
Description:

Implementation of the second phase of works on the improvement of the water supply and wastewater disposal system in Kotor, with the aim of improving communal infrastructure, increasing the reliability of water supply and efficient collection and treatment of waste water, thereby improving the living conditions of the population and environmental protection.

Project results:

Improvement of the water supply and waste water disposal system in ​​Kotor, reduction of losses in the water supply network, increase of reliability and capacity of the system.

Water Supply Improvement in Kotor
PHASE I
Project status: Completed
Value: cca Euro 5.5 million (for Herceg Novi, Bar, Kotor, Budva, Tivat, Cetinje and Ulcinj)
Funding sources: Consortium of five Montenegrin banks
Consultant: MACS GMBH from Frankfurt (responsible for monitoring implementation of investment measures)
Contractor: MACS GMBH, Frankfurt
Implementation period: 2004-2005
Description:

Konsultantske usluge za razvoj kapaciteta vodovodnih i kanalizacionih preduzeća na Crnogorskom Primorju.

Project results:

Implementation of Phase I investment measures resulted in increased water quantities and significant savings.