P2200112.jpg

On 20 February 2019 there was a presentation regarding the construction of the new sewage network in Perast organized in the premises of the local community Perast for the local citizens and all interested parties. This presentation was given by representatives of Fichtner from Germany that will be the main consultant for producing the design and its partner IWA Consult from Serbia was aimed at introducing the attendees with the purpose, aims and activities of this Project.

This wastewater development project covers the construction of the sewerage system for entire town of Perast, while, within the water supply project, additional sections of the distribution system will be constructed, and a part of the old network will be replaced. This presentation was attended by representatives of the Employer, ViK Kotor and the Municipality of Kotor.

The project measure for the construction of the sewage network for Risan and Perast (including transmission sewage system towards the settlement Muo) was nominated by the Municipality of Kotor in cooperation with Vodacom, Ministry of Sustainable Development and Tourism, and KfW Development Bank within a third call of applications from the Western Balkans Investment Framework (WBIF).

This project measure was positively screened by the European Commission in December 2018, which approved a grant of EUR 4.7 million to finance the construction of a sewerage system in Risan and Perast.